top of page

ADVERT & SIGNS.

ADVERT & SIGNS.

Signage in Geylang, Aljunied, Paya Lebar, Ubi and Kaki Bukit: Shophouse, Industrial and Hawker Rules

Writer: Advert & Signs Team
Advert & Signs Team
13 minutes ago
2 min read

Last reviewed: 21 November 2026.

This stretch of the east mixes conserved shophouses in Geylang, industrial estates in Ubi and Kaki Bukit, and the area around Paya Lebar Air Base. Who approves your sign depends on which of these you are in, and outdoor signs also need a BCA licence.

Geylang shophouses

Geylang is a conservation Secondary Settlement (URA), so URA's rules depend on the part of the façade: a projecting sign goes on the left-hand column, no wider than 600 mm, with at least 2.5 m of headroom (URA: signs in conservation areas). See our shophouse conservation guide.

Ubi and Kaki Bukit industrial units

  • JTC-owned units: one unit sign of up to 800 × 600 mm beside the door, endorsed by JTC, and no façade advertising (JTC fit-out guidelines).

  • Privately owned strata industrial buildings: the MCST's written consent is needed, and tenants also need the owner's consent (BCA).

  • Wall advertising: where the landlord is not stricter, URA's guideline for signs outside the Central Area allows industrial wall advertising of up to 100 m² or 50% of the wall below 30 m (URA DC09-21). URA lists it as archived, but BCA still refers to it.

Near Paya Lebar Air Base

BCA does not allow advertising signs in or near the boundaries of airports and airbases (BCA). URA plans to redevelop the air base area from the 2030s (URA); until then, check with us before planning an advertising sign nearby.

Hawker stalls

Stalls in hawker centres, food centres and markets are exempt from BCA licensing (BCA). See our hawker signboard guide.

A job we did here

What's changing here

  • Paya Lebar iPark is planned at 18 Tai Seng (URA Master Plan 2025).

  • JTC has launched an industrial land sale in Kaki Bukit (JTC).

Questions we hear about signs in Ubi and Paya Lebar

My unit is in a privately owned industrial building in Ubi. Who approves my sign? The MCST, then BCA. If you rent, you also need the owner's consent.

How long does it take? BCA processes a licence in about 7 working days (BCA), after the landlord's or MCST's approval.

Get a quote

We design and make every sign at our workshop at 16C Tuas Ave 1, #09-53 JTC Space @ Tuas, install across Singapore, and handle the BCA licence. Message us on WhatsApp. Nearby guides: Marine Parade, Katong and Joo Chiat and Tampines, Bedok and Changi.

Recent Posts

See All

Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.
bottom of page